Jump to content

Metro Manila Skyway

Coordinates: 14°30′23″N 121°2′7″E / 14.50639°N 121.03528°E / 14.50639; 121.03528
From Wikipedia, the free encyclopedia
(Redirected from Skyway Stage 3)

Skyway
Metro Manila Skyway System
Map of expressways in Luzon, with the Skyway in orange
Skyway S1 near Bicutan 2023-04-09.jpg
The expressway near Bicutan Exit in Parañaque, April 2023
Route information
Maintained by Skyway Operations and Maintenance Corporation
Length39.3 km (24.4 mi)
Approximate length
Stage 1 – 9.3 km (5.8 mi)[1]
Stage 2 – 6.86 km (4.26 mi)[1]
Stage 3 – 18.83 km (11.70 mi)[2]
SLEX Elevated Extension[note 1] – 4.01 km (2.49 mi)[note 2]
Existed1990s–present
Component
highways
RestrictionsNo motorcycles below 400cc, trucks, modified 4 or 6-wheeler closed vans[6]
Major junctions
North end AH 26 (E1) (North Luzon Expressway) in Caloocan[note 4]
Major intersections
South end AH 26 (E2) (South Luzon Expressway) in Muntinlupa
Location
CountryPhilippines
RegionsMetro Manila
Major citiesCaloocan, Makati, Malabon, Manila, Muntinlupa, Parañaque, Pasay, Quezon City, San Juan, Taguig
Highway system
  • Roads in the Philippines

The Metro Manila Skyway, officially the Metro Manila Skyway System (MMSS) or simply the Skyway, is an elevated highway serving as the main expressway of Metro Manila, Philippines. It connects the North and South Luzon Expressways (NLEX and SLEX) with access to Ninoy Aquino International Airport via the NAIA Expressway (NAIAX). It is the first fully grade-separated highway in the Philippines and one of the longest elevated highways in the world, with a total length of approximately 39.2 kilometers (24.4 mi).

The expressway runs above major existing highways in Metro Manila and the San Juan River. It passes through the highly urbanized areas of Caloocan, Malabon, Quezon City, Manila, Makati, Pasay, Taguig, Parañaque, and Muntinlupa, easing congestion on other major thoroughfares. The Skyway is accessible to Class 1 vehicles (i.e. cars, vans, motorcycles above 400 cc (24 cu in), pick-up trucks, and SUVs), Class 2 vehicles, and public utility vehicles (PUVs).[6] Previously, Class 2 vehicles and PUVs were banned due to the construction of the SLEX Elevated Extension Project in Muntinlupa.[7][8][9]

Route

[edit]
Stage 3 southbound over San Juan River
Skyway Elevated (center) with the Skyway At-Grade section of South Luzon Expressway (left) and East Service Road (right) facing towards Sales Interchange
Skyway/SLEX Elevated Extension northbound

The Skyway connects the North and South Luzon Expressways. It runs above several major roads in Metro Manila, with strategically located entry and exit ramps. The expressway is divided into stages. Stage 3 runs from the North Luzon Expressway, near its Balintawak toll plaza in Caloocan, to Buendia exit in Makati; Stage 1 runs from Buendia to Bicutan in Parañaque, and Stage 2 runs from Bicutan to South Station (Alabang-Zapote) Exit in Alabang, Muntinlupa, and the South Luzon Expressway (SLEX) Elevated Extension,[5][10] formerly known as the Skyway Extension and also known Alabang South Skyway Extension,[11] from the Skyway Main Line toll plaza in Cupang to the South Luzon Expressway in Putatan, Muntinlupa. Stages 1 and 2 are collectively known as the South Metro Manila Skyway Project.[12]

Until 2020, the Skyway was a dual elevated carriageway with shoulders on both sides for most of its length with six lanes (three in each direction) separated by a median barrier. While four to two lanes were also used from Sucat to South Station. After the completion of Skyway Stage 3 and the SLEX Elevated Extension, the expressway's original stretch was expanded to seven lanes (three lanes northbound and four lanes southbound), five lanes (two lanes northbound and three lanes southbound), and three lanes (one lane northbound two lanes southbound).[13]

From the North Luzon Expressway, the Skyway begins in Libis Baesa, Caloocan, about 1 kilometer (0.62 mi) south of the Balintawak toll plaza.[2] A possible connection to a future toll road to New Manila International Airport in Bulacan is at that exit.[14] It enters Quezon City and after rising above the Balintawak Interchange (where it crosses EDSA), it turns east towards Circumferential Road 3 (C-3), particularly Sgt. Rivera and G. Araneta Avenues.

The expressway runs south above Gregorio Araneta Avenue until it reaches the San Juan River. The Skyway follows the river to its mouth at the Pasig River in Manila before turning towards the San Miguel Yamamura packaging plant (owned by Skyway concessionaire San Miguel Corporation) in Pandacan. There, it will meet the 1.2-kilometer (0.75 mi) elevated connecting road to the NLEX Connector in Santa Mesa that will branch off parallel to the Philippine National Railways (PNR) tracks.[15] The main expressway turns east onto Tomas Claudio Street (Paco–Santa Mesa Road) and Nagtahan Link Bridge towards Quirino Avenue (C-2). It then turns towards Osmeña Highway and enters Makati,[16] where the Buendia exit is located.

The expressway rises at the boundary of Osmeña Highway and South Luzon Expressway (SLEX) known as Magallanes Interchange and returns to its original level after crossing the said interchange. After its interchange with NAIAX, it descends to ground level because of height restrictions on structures near Ninoy Aquino International Airport and parallels SLEX and the PNR tracks at the PasayTaguig boundary. The Skyway again rises near the C-5 Exit and Arca South, entering Parañaque and returning above SLEX. At the Sucat Exit, the Skyway rises above the east end of Dr. A. Santos Avenue and descends as it approaches the main toll plaza in Cupang, Muntinlupa. After the toll plaza, it meets the SLEX Elevated Extension which connects it to SLEX past the Alabang Viaduct, narrows to three lanes, and curves west before joining Alabang–Zapote Road near South Station in Filinvest City, Alabang. The extension runs parallel to SLEX along the shoulder of the Alabang Viaduct and Manila South Road, crossing the Alabang and Filinvest exits and descending to merge with SLEX near Pleasant Village and Soldiers Hills.[17]

Features

[edit]

Lanes

[edit]

Currently, the expressway is using lane configurations without shoulders to ensure a smooth flow of traffic, as listed below.[18]

7-lane zones

[edit]

4 lanes northbound and 3 lanes southbound from Sgt. Rivera (C-3/R-10) to Pandacan and again from Quirino to Buendia (Gil Puyat), and 3 lanes northbound and 4 lanes southbound from Buendia (Gil Puyat) to Sucat (Dr. A Santos).

5-lane zones

[edit]

2 lanes northbound and 3 lanes southbound from Balintawak (NLEX) to Sgt. Rivera (C-3/R-10) and again from Sucat (Dr. A Santos) to Skyway Main Toll Plaza, as well as 3 lanes northbound and 2 lanes southbound from Skyway Main Toll Plaza to SLEX, north of the MCX/Susana Heights interchange.

History

[edit]
Former Skyway logo: the word "Skyway" in blue and a red arch on a white background
Skyway logo from 1995 to 2017, still used alternatively

Development and planning

[edit]

In 1992, the government proposed the idea of building an elevated expressway from Quirino Avenue in Manila to Alabang, Muntinlupa, spanning 20 kilometers (12 mi). This project would have been a build–operate–transfer (BOT) scheme, and at the time of its development, Parañaque Representative Roilo Golez won the support of many congressmen to make a proposal to relieve congestion on the existing South Luzon Expressway with a segment between Magallanes and Alabang.[19][20] In December 1992, House Speaker Jose de Venecia Jr. sought to build second-storey highways in Metro Manila to ease traffic congestion. At the same time, President Fidel V. Ramos asked the House Speaker and House Public Works Committee Chairman, Rep. Victor Ortega, to pass the solidated five-year Public Works Act before February 1993 to include the proposal of elevated highways in the region.[21]

In 1993, the Japan International Cooperation Agency (JICA) conducted a study on the proposed urban expressway system in Metro Manila. The master plan for the planned network was meant to have 150 kilometers (93 mi) of expressways, including a route on the Radial Road 3 (R-3) alignment from Quirino Avenue to Alabang, with the total length of about 20 kilometers (12 mi). It also included routes on the Quirino Avenue, San Juan River and Circumferential Road 3 (C-3) alignments as the proposed Inner Circumferential Expressway from Adriatico Street in Malate, Manila to Radial Road 10 (R-10) in Navotas, with a length of 17.5 kilometers (10.9 mi) and on the Radial Road 9 (R-9) alignment from C-3 in Quezon City to North Luzon Expressway in Caloocan, with a length of 3.8 kilometers (2.4 mi).[22] In the same year, Metro Manila Skyway was launched.[23]

Jakarta-based investor Citra Lamtoro Gung Persada (CITRA), owned by Siti Hardiyanti Rukmana (a daughter of Indonesian President Suharto), signed a Supplemental Toll Operation Agreement (STOA) in November 1995 with the Toll Regulatory Board (TRB) as a grantor and the Philippine National Construction Corporation (PNCC) as operator. Negotiations began on October 31, 1994, with a group composed of representatives from the Board of Investments (BOI), the Department of Finance (DOF), AIA Capital as a financial adviser, the Department of Public Works and Highways (DPWH), the TRB, the PNCC, and CITRA. Under the STOA, Citra Metro Manila Tollways Corporation (CMMTC) was mandated to finance, design, and construct Stage 1 of the South Metro Manila Tollway Project (an elevated expressway from Bicutan to Buendia) and rehabilitate the at-grade portion of the South Metro Manila Tollway project from Magallanes to Alabang. The STOA was approved by President Ramos in April 1996.

Stage 1

[edit]
A segment of Skyway Stage 1 (with its at-grade portion at SLEX on the right) circa 2006, with the former Skyway Toll Plaza seen here.

Stage 1 involved the rehabilitation of the 13.43-kilometer (8.35 mi) at-grade portion of South Luzon Expressway from Magallanes to Alabang and the construction of a six-lane, 9.3-kilometer (5.8 mi) elevated expressway above it from Buendia to Bicutan. Construction of Stage 1 began on November 27, 1995, with actual work beginning in 1996.[24] The girder launching technology was used during the construction. Special girder launchers were used to lift the girders, minimizing the traffic disruption along the South Luzon Expressway.[25]

The Magallanes–Bicutan segment was inaugurated by President Joseph Estrada on December 10, 1998,[23] followed by the Buendia–Magallanes segment. The Magallanes and Bicutan exits, as well as Skyway Toll Plazas A and B, were the first to be completed, followed by the Buendia and Makati (now Amorsolo) exits. The Don Bosco exit started its construction on November 17, 2001, and opened on January 3, 2002, and the construction of NAIA Interchange followed, lasting from March 17, 2004, to its completion on May 30, 2009.[26][27][28] CMMTC spent US$32.7 million (₱1.57 billion) on the 9.3-kilometer (5.8 mi) portion of Stage 1.[1]

Stage 2

[edit]

On April 2, 2009, CITRA announced construction of the second stage;[29] by June of that year, new pillars were constructed. The stage was half done by May 2010, rotating the highest pierhead in the Sucat area. On December 15, 2010, the Bicutan–Sucat portion of Stage 2 opened to the public.[30]

Motorists initially used this portion free of charge for one week, when Skyway tolls were reduced to its 2007 rates. On April 6, 2011, the Hillsborough ramps, Skyway Main Line toll plaza, and South Station exit were opened to the public toll-free until April 25.[31] Stage 2 extended the toll road by about 6.86 kilometers (4.26 mi), from Bicutan to Alabang.[1]

Stage 3

[edit]
Aerial view of a highway under construction through an urban area
Stage 3 under construction above G. Araneta Avenue in Quezon City (2018)
Stage 3's double-decker segment in Pandacan, Manila (June 2021)

The original plan for the third stage was conceptually in the 1990s. The route would have been a 10.5 km route between Quirino Avenue and Sgt. Rivera and Stage 2 for its two routes would have run from Buendia (Gil Puyat) to Quirino Avenue for 2.5 kilometers, then again from Sgt. Rivera to NLEX for 3 kilometers. All of the proposals were mentioned in the sources and in the 1999 Metro Manila Urban Transportation Integration Study (MMUTIS).

In 2007, Chinese Premier Wen Jiabao expressed China's interest, particularly the government-owned China Road and Bridge Corporation, in completing the Skyway project, which was supposed to link Alabang to Makati and then up to Balintawak, Quezon City.[32] Additionally, there are plans to incorporate the port linkage (now absorbed by the new section NLEX Harbor Link) that connects Manila North Harbor and Radial Road 10.[33]

The Department of Public Works and Highways (DPWH) received an unsolicited proposal to construct a Skyway extension from San Miguel Corporation-backed Citra Metro Manila Tollways Corporation (CMMTC), which would run from Buendia (Gil Puyat), Makati to Balintawak, Quezon City. The DPWH subjected the proposal to a Swiss challenge, which requires a government agency that has received an unsolicited bid for a project to publish the bid and invite third parties to match (or exceed) it. The project was approved by President Benigno Aquino III in September 2013.[34]

The groundbreaking ceremony of Skyway Stage 3 was held on January 22, 2014,[35] and construction began on February 17.[36][37] It was expected to be completed in 2017, but the project experienced construction delays.[38] Work stoppages due to the COVID-19 pandemic further delayed the project's full opening until late 2020.

During its construction of Stage 3, several drainage lines and electric poles were relocated to give space for the foundations of its expressway. The power transmission line of National Grid Corporation of the Philippines (NGCP), were rerouted. Most notably, the Sucat-Paco-Araneta-Balintawak Transmission Line relocates Araneta-Balintawak segment and Sucat-Paco segment with new steel poles while the old ones were retired.

Originally planned as divided into four segments,[39] the original route was supposed to cross the Pasig River, meet the NLEX-SLEX Connector Road (the present-day NLEX Connector) near the PUP campus, and pass through Santa Mesa district and the city of San Juan. Due to right-of-way issues, however, it could not traverse through Santa Mesa and instead made it turn right from Tomas Claudio Street through the San Miguel Yamamura Packaging Corporation plastic plant in Pandacan towards the San Juan River and to Gregorio Araneta Avenue. A second modification added a fifth segment at the north end which would cross the Balintawak Interchange and connect to the North Luzon Expressway's Balintawak toll plaza in Caloocan, extending Stage 3 to 18.83 kilometers (11.70 mi).[2] The new segment raised the possibility of further northward expansion, eventually realized as the NALEX (Northern Access Link Expressway).

Prior to the COVID-19 pandemic, the Stage 3 project was to have six lanes per direction, and toll collection was supposed to be located at every exit. The planned Toll Plazas A and B were to be located in San Andres, north of the Buendia (Gil Puyat) southbound exit ramp. However, the plans were scrapped due to changes in toll collection to contactless, as well as the widening of the expressway to seven lanes.

Two significant accidents occurred during construction. On August 18, 2019, a coping beam collapsed on vehicles on the North Luzon Expressway, delaying southbound traffic; no injuries were reported.[40] A February 1, 2020 fire at the San Miguel Yamamura Packaging Corporation plastic plant in Pandacan caused a 300-meter (980 ft) portion of Stage 3 to collapse, creating a long delay of the project.[41] Fire damage required reconstruction of pierheads and replacement of the burnt girders, delaying the 2020 opening of the segment from April to November.[42] Also, the planned opening was delayed amidst lockdowns due to COVID-19.

The northbound Buendia–Quirino portion opened on July 20, 2018.[43] The Buendia–Plaza Dilao segment was partially opened toll-free on July 22, 2019,[44][45] and the northbound exit ramp to Quirino Avenue opened on December 23 of that year.[2] On October 13, 2020, San Miguel Corporation announced the final concrete pouring and completion of Skyway Stage 3. Due to rain, however, the asphalt overlay was delayed.[46][47][48] On December 29, the remaining segment of Stage 3 (to NLEX) partially opened.[49] It was inaugurated on January 14, 2021,[50] and became fully operational the following day,[51] toll-free until July 12.[52] While work on the expressway was being completed, Stage 3 was closed daily from 10:00 pm to 5:00 am (PST) daily.[2] The segment opened around the clock in August 2021. Some toll plazas and entrance and exit ramps were closed from April 5–8 and May 24–28 for system tests by the Toll Regulatory Board (TRB).[53][54]

Work on the elevated 1.2-kilometer (0.75 mi) link connecting the Skyway with the NLEX Connector began on January 28, 2021, after delays due to right-of-way issues.[15][55] Other entry and exit ramps were slated to open during the next few months.[2][56][57] Toll collection began on July 12, 2021, after delays in toll approval and an operating permit.[58]

In December 2022, it was reported that Metro Pacific Tollways Corporation (MPTC) would take over the spur of the third stage. They sent a letter to the DPWH about requesting to build the 1.2-kilometer (km) interconnection structure. MPTC also wants to build the connector road itself while looking for an alternative alignment that can cross the Pasig River.[59][60]

SLEX Elevated Extension

[edit]
SLEX Elevated Extension under construction (above) (January 2021)

First proposed by San Miguel Corporation as the Skyway Extension Project in November 2017,[61] the extension project planned to expand the two-lane section from the Skyway Main Line toll plaza to Alabang–Zapote Road to six lanes (three in each direction) and build an extension from South Station in Alabang to the South Luzon Expressway's Susana Heights exit in Muntinlupa. The SLEX Elevated Extension is the first phase of the corporation's three-year expansion project of all toll roads in southern Metro Manila to ease traffic congestion. In addition to ramps connecting the South Luzon Expressway section near Soldiers Hills and the Skyway main toll plaza, it will include construction of a northbound ramp connecting the Alabang viaduct to the South Station toll plaza and widening of the South Station toll plaza.[4]

Construction of the extension began in August 2019.[62] To facilitate the extension's construction, the Hillsborough ramps were closed and demolished; the northbound on-ramp was closed in 2020, followed by the southbound off-ramp on April 19, 2021.[63] The extension was originally expected to be completed by December 2020. However, the COVID-19 pandemic and construction delays postponed the extension opening until 2021. A November 21, 2020 construction accident on the East Service Road in Barangay Cupang, Muntinlupa caused delays.[64] The 3.99-kilometer (2.48 mi) northbound section of the project was finished on March 24, 2021, and was soft-opened (toll-free until further notice) on April 11.[3][4][65][66][67] The 3.6-kilometer (2.2 mi) southbound section then opened on December 10.[68] The extension was inaugurated on February 15, 2022, as the South Luzon Expressway (SLEX) Elevated Extension Project.[5][10]

Operations and maintenance

[edit]

The Skyway is operated and maintained by the Skyway Operations and Maintenance Corporation (SOMCO). SOMCO took over the expressway's operations and maintenance from former operator PNCC Skyway Corporation in January 2008 and was declared to comply with the July 2007 Amended Supplemental Toll Operators Agreement (A-STOA) between the PNCC, Citra Metro Manila Tollways Corporation and the Toll Regulatory Board (TRB), which awarded management of the 35-kilometer (22 mi) road to Citra. The Skyway uses the Vendeka toll-collection system. SOMCO controls the Skyway three main operational functions: traffic safety and management, maintenance, and toll collection.

The expressway's concessionaire varies by stage. The concessionaire of Stages 1 and 2 (known as the South Metro Manila Skyway Project), including the at-grade portion of the South Luzon Expressway from Magallanes to Alabang, and SLEX Elevated Extension is SMC Skyway Corporation (formerly Citra Metro Manila Tollways Corporation, or CMMTC).[4][69] The concessionaire of Stage 3 is SMC Skyway Stage 3 Corporation (formerly Citra Central Expressway Corporation), a subsidiary of Stage 3 Connector Tollways Holding Corporation (S3CTH).[70]

The aforementioned companies are subsidiaries of San Miguel Corporation through SMC Infrastructure.[1][71][72][73]

Future

[edit]

Skyway Stage 4

[edit]
Elevated highway under construction
Construction of SEMME along Carlos P. Garcia Avenue (C-5) (August 2022)

The Southeast Metro Manila Expressway (SEMME), also known as Skyway Stage 4, is a 32.664-kilometer (20.296 mi) under-construction expressway from Skyway Stage 2 near Arca South in Taguig to Batasan Road (near Batasang Pambansa Complex) in Quezon City. The expressway is planned to extend to Bulacan. The project aims to provide an alternate route to EDSA, C-5, and other major roads for motorists coming from Rizal and the Calabarzon area to ease traffic congestion.[1] The project's groundbreaking ceremony was held on January 8, 2018,[74] and it was expected to be completed by 2022.[75][needs update] As of 2024, however, the project was delayed due to right-of-way issues.

[edit]
Pillars and girders of the future NALEX
Pillars and girders for the Northern Access Link Expressway above NLEX, near Skyway's Balintawak Exit (January 2024)

As a part of San Miguel Corporation's New Manila International Airport (NMIA) project, the concessionaire proposed linking the airport to NLEX and SLEX via Skyway Stage 3.[14][76] The section of NLEX between its Balintawak toll plaza and Skyway's Balintawak on- and off-ramps mostly in Caloocan has pillars to connect the Skyway northward to a future toll road which will lead to the new airport in Bulakan, Bulacan.[77] The project runs above a toll road operated by NLEX Corporation, another concessionaire.

The toll road project, later known as the Northern Access Link Expressway (NALEX), was approved by the Toll Regulatory Board in June 2022. It would be 19 kilometers (12 mi) long from Skyway Stage 3 to a roundabout in Meycauayan, near the airport. Another 117-kilometer (73 mi) stretch would be built beyond the NMIA roundabout, ending at the southern end of the Tarlac–Pangasinan–La Union Expressway in Tarlac City. When completed, NALEX would be 136 kilometers (85 mi) long. The NALEX project costs ₱148 billion and the first segment is targeted to be completed by 2026.[78]

[edit]

The Southern Access Link Expressway (SALEX) is a proposed series of elevated expressways through the western part of Metro Manila. It is part of Component 2 of the Greater Capital Region Integrated Expressways Network. SALEX is a proposed 40.65-km elevated expressway network comprising the Shoreline Expressway and three (3) Metro Manila Skyway Stage (MMSS3) Extensions, namely: C3-R10 Extension, Quirino Extension, and Buendia (Gil Puyat) Extension.[79] SALEX will improve motorists’ access to the NMIA as well as support its surrounding economies.[80]

Bus rapid transit

[edit]

According to San Miguel Corporation president and COO Ramon Ang, the company began considering bus rapid transit on the Skyway in 2017. The proposed system, announced on April 26, 2021, may have high-capacity point-to-point (P2P) buses, and will be sent to the Department of Transportation when finalized. It aims to make commutes safer and more convenient, maximizing the benefits of the elevated expressway in diverting vehicles from other roads.[81][82] However, no updates were made.

Tolls

[edit]
The Skyway looking south towards the Main Line toll plaza in Muntinlupa
Four-lane toll plaza
Del Monte Toll Plaza B (southbound)

The expressway combines open-road, closed-road, and barrier toll systems. Toll collection is divided between the South Metro Manila Skyway Project and Skyway Stage 3 but are altogether part of the Seamless Southern Tollways program of San Miguel Corporation.[83]

The South Metro Manila Skyway toll system is integrated with the South Luzon (SLEX) and Muntinlupa–Cavite Expressways (MCX).[84] Northbound tolls are collected upon entry on Skyway or NAIAX. Entering motorists from SLEX pay an additional toll at the Main Line toll plaza in Muntinlupa. Tolls are not charged at northbound exits from Magallanes to Buendia, but additional toll fees apply upon exit from NAIAX or Skyway Stage 3.[85] Southbound tolls are collected upon exit from Skyway, NAIAX, SLEX, MCX, or STAR Tollway.[83][86] No tickets are issued at southbound entrances.

On the other hand, Stage 3 tolls are based on distance and vehicle class. Northbound tolls are collected at either Del Monte toll plaza for exits at Sgt. Rivera, A. Bonifacio, or Balintawak (NLEX), or upon exit elsewhere. Southbound tolls are collected at either Del Monte for exits at Quezon Avenue or G. Araneta, or upon exit elsewhere. Exit toll collection for NLEX Connector (via elevated spur road in Manila) is yet to be determined.

The Skyway uses the RFID-based Autosweep electronic toll collection (ETC) system used on the expressways by San Miguel Tollways. Previously, the transponder-based E-Pass was used. ETC lanes are usually on the left lane of a toll plaza, but mixed lanes also accepting cash exist. More ETC lanes were added at toll barriers as Philippine tollways shift towards cashless toll collection.[87] RFID installation and reloading lanes are also located at selected Skyway toll plazas.[88] Cash is accepted only at South Skyway and some toll plazas of Stage 3.[89]

Class 3 vehicles are currently not permitted to use the Skyway,[7][8] and trucks are banned on Stage 3 due to safety concerns.[90] The under-construction NLEX Connector is expected to compensate for the restriction, which will bypass the majority of Stage 3 to connect to South Skyway.

The toll rates are as follows:

South Metro Manila Skyway

[edit]
Class Toll[84]
to & from Alabang/SLEX to & from Sucat to & from Bicutan
Class 1
(Cars, motorcycles, SUVs)
164.00 ₱118.00 ₱72.00
Class 2
(Buses, light trucks)
₱329.00 ₱237.00 ₱145.00
Class 3
(Heavy trucks)
₱493.00 ₱356.00 ₱218.00

Skyway Stage 3

[edit]
Class Toll[58][91]
Buendia to Plaza Azul/Nagtahan E. Rodriguez to NLEX Balintawak Buendia to NLEX Balintawak
Class 1
(Cars, motorcycles, SUVs)
105.00 ₱129.00 ₱264.00
Class 2
(Buses, light trucks)
₱210.00 ₱258.00 ₱528.00

Exits

[edit]

This entire route is located in Metro Manila. Exits and intersections are numbered by kilometer posts, currently found only on Stages 1 and 2, with Rizal Park in Manila designated as Kilometer 0

ProvinceCity/Municipalitykm[16]miExitNameDestinationsNotes
CaloocanMalabon boundary[92]Balintawak (NLEX)[93] AH 26 (E1) (NLEX) – Tarlac, BaguioNorthbound exit and southbound entrance; northern terminus of the Skyway system; future link to Northern Access Link Expressway[14][78][note 4]
Quezon CityA. Bonifacio (EDSA) N160 (A. Bonifacio Avenue) – BalintawakNorthbound exit and southbound entrance[94]
Sgt. Rivera (C-3/R-10)[95] N130 (5th Avenue) – Caloocan, R-10, BalintawakNorthbound exit,[96] southbound entrance,[97] and tolled southbound exit; includes northbound exit ramp to N130 (Sgt. Rivera Avenue) / N160 (A. Bonifacio Avenue)
Del Monte Toll Plaza
Quezon Avenue (Maria Clara/Talayan) N130 (G. Araneta Avenue) / Maria Clara / Calamba StreetNorthbound exit[98]
Quezon Avenue N130 (G. Araneta Avenue) / N170 (Quezon Avenue)Tolled northbound exit, northbound entrance and southbound entrance; untolled southbound exit
G. Araneta (Araneta Avenue) N130 (G. Araneta Avenue)Southbound exit (formerly E. Rodriguez) and tolled northbound entrance;[94] access to N180 (Aurora Boulevard & Magsaysay Boulevard)
Aurora Boulevard[2]G. Araneta AvenueFuture northbound entrance near N. Domingo Street, San Juan. Ramps yet to be built.
ManilaTomas ClaudioLink to NLEX Connector via elevated spur road
Nagtahan N140 (Quirino Avenue) – NagtahanTolled southbound exit and northbound entrance[94]
Quirino (Pedro Gil) N140 (Quirino Avenue) / N156 (Plaza Dilao Road) – Plaza DilaoTolled southbound exit; construction of ramp to N156 (Quirino Avenue Extension) suspended
Nagtahan N140 (Quirino Avenue) – NagtahanTolled northbound exit
Plaza Dilao N140 (Quirino Avenue)Tolled southbound entrance
Quirino N140 (Quirino Avenue) / Pedro Gil Street – Santa Mesa, Roxas BoulevardTolled northbound exit and northbound entrance;[99] southbound entrance from N145 (Osmeña Highway) construction pending[2]
Gil Puyat Toll Plaza B (southbound only)[note 5]
Gil Puyat Toll Plaza A (southbound only)[note 5]
Makati
6

3.7
Buendia (Gil Puyat) N145 (Osmeña Highway) / N190 (Gil Puyat Avenue)Tolled northbound entrance and southbound exit (Zobel); untolled northbound exit and southbound entrance; northern end of AH26 concurrency; northern terminus until construction works of Stage 3 reached North Luzon Expressway (NLEX) in 2019.
6.6–
6.7
4.1–
4.2
AmorsoloAmorsolo StreetNorthbound exit and southbound entrance; entrance ramp accessible via Arnaiz Avenue westbound
7.24.5Don Bosco N145 (Osmeña Highway) / Don Bosco StreetNorthbound exit
PasayTaguig boundary9.35.8Magallanes AH 26 (E2) (SLEX) – MagallanesNorthbound exit and southbound entrance
Taguig9.6–
10.1
6.0–
6.3
NAIAX E6 (NAIAX) – NAIA Terminals 1, 2, 3Directional T interchange, part of Sales Interchange
10.56.5Skyway Toll Plaza A (1998–2011, demolished) [note 6]
11.06.8Runway Toll Plaza A (northbound only, pass-thru for northbound light vehicles) (2018–2020, demolished)[85][100][101]
11.16.9Runway Toll Plaza (Skyway/Runway Toll Plaza B)[note 7] (northbound only, pass-thru and RFID installation and reloading station) (1998–2011, 2018–present)[85][100]
TaguigParañaque boundary11.9–
12.1
7.4–
7.5
E2 (SEMME) – TITX, Arca South, RizalFuture Skyway/FTI Interchange of SEMME; directional T interchange
Parañaque13.4–
13.5
8.3–
8.4
Bicutan (Doña Soledad)Doña Soledad AvenueTolled southbound exit and northbound entrance. Southern terminus until the construction of piers at the south end of Stage 2 at Alabang, Muntinlupa in 2009.
14.69.1SLEXTemporary southbound exit and northbound entrance until 2011.
ParañaqueMuntinlupa boundary17.510.9Sucat (Dr. A. Santos) N63 (Dr. A. Santos Avenue)Tolled southbound exit and northbound entrance
Muntinlupa19.011.8Skyway Main Toll Plaza A (pass-thru for southbound vehicles)
19.111.9Skyway Main Toll Plaza B (pass-thru for southbound vehicles)
19.512.1Hillsborough AH 26 (E2) (SLEX) – CalambaNorthbound entrance (2011–2020) and southbound exit (2011–2021), replaced by the Skyway Extension Project[102]
21.113.1South Station (Alabang) Toll Plaza (2011–2020, demolished)[101]
AH 26 (E2) (SLEX)Skyway-Alabang Viaduct Connecting Ramp; future northbound entrance to be built from the shoulder of Alabang Viaduct[17][4]
21.3313.25 AH 26 (E2) (SLEX) – CalambaTemporary southbound exit[103] and northbound entrance[104] during the construction of Extension Project[105][106] (2019–2021)
21.613.4South Station (Alabang-Zapote / Bunye) N411 (Alabang–Zapote Road) – South Station, Las PiñasTolled southbound exit and northbound entrance; former southern terminus (2011–2021)
SLEX Elevated Extension AH 26 (E2) (SLEX) – Laguna, Batangas, QuezonTolled (pending operation) northbound entrance and untolled southbound exit; southern terminus of the Skyway system[17][65] Section renamed as SLEX Elevated Extension [107]
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
[edit]

The entire route is located in Manila. Referred to as Sections 2A' (Tomas Claudio – PUP, Sta. Mesa)[2] or as part of Section 1A - 2 (Plaza Berde – PUP campus) of Skyway Stage 3,[12] this 1.2-kilometer (0.75 mi) segment of Skyway will link the main line of Skyway Stage 3 near Tomas Claudio Street (Nagtahan Link Bridge) and NLEX Connector near the Polytechnic University of the Philippines (PUP) campus in Santa Mesa.[15] 

kmmiExitNameDestinationsNotes
Tomas Claudio[108]SkywaySouthern terminus of the spur. Connection to the main line of Skyway.
N141 (Valenzuela Street) – Santa MesaNorthbound exit and southbound entry; under planning and for approval
NLEX ConnectorNorthern terminus of the spur. Continues north as NLEX Connector.
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
  •       Unopened

See also

[edit]

Notes

[edit]
  1. ^ South Luzon Expressway (SLEX) Elevated Extension is also known as Skyway Extension.
  2. ^ The northbound section of Skyway/SLEX Elevated Extension is 4.01 kilometers (2.49 mi) long, while the southbound section is 3.71 kilometers (2.31 mi) long.[3][4] Thus, the entire Skyway/SLEX Elevated Extension is approximately 4 kilometers (2.5 mi) long.[5]
  3. ^ The extent of E2/AH26 on Skyway is unknown since the DPWH's GIS apps do not show any route designation for the tollway. Despite this, some E2/AH26 markers were seen between Buendia, Makati, and Alabang, Muntinlupa, until they were dismantled together with the center barriers in 2020.
  4. ^ a b San Miguel Corporation, the Department of Public Works and Highways, and various news outlets consider the northern terminus of Skyway at Balintawak as part of Quezon City even after the addition of Section 5. However, various maps show that it is located in Caloocan.
  5. ^ a b The toll plazas were planned as part of the original project. These were demolished in 2020, a few months before the opening of Skyway Stage 3.[16] The former site of the southbound toll plazas later housed RFID installation lanes for northbound motorists.
  6. ^ Toll Plaza A served both directions while Toll Plaza B served northbound vehicles only.
  7. ^ Runway Toll Plaza is previously known as Runway Toll Plaza B especially when it coexisted with the former Runway Toll Plaza A from 2018 to 2020. Previously, it was the site of the Skyway Toll Plaza B until 2011.

References

[edit]
  1. ^ a b c d e f "Infrastructure - San Miguel Corporation". San Miguel Corporation. Retrieved October 23, 2021.
  2. ^ a b c d e f g h i "METRO MANILA SKYWAY STAGE 3 (MMSS-3) – Department of Public Works and Highways". Department of Public Works and Highways. Archived from the original on February 27, 2021. Retrieved October 9, 2020.
  3. ^ a b "Northbound section of Skyway Extension now 'structurally complete'". CNN Philippines. March 24, 2021. Archived from the original on April 6, 2023. Retrieved March 25, 2021.
  4. ^ a b c d e "Sucat-Alabang Skyway Connection and Ramp Extensions Project". Department of Public Works and Highways.
  5. ^ a b c Cordero, Ted (February 15, 2022). "Duterte inaugurates San Miguel's P14-billion SLEX Elevated Extension project". GMA News. Retrieved February 15, 2022.
  6. ^ a b "Buses, Classes 2 Vehicles Allowed On Elevated Skyway Starting April 1". CarGuide.PH. March 21, 2022. Retrieved March 22, 2022.
  7. ^ a b Altoveros, Jose (February 11, 2020). "Metro Manila Skyway will be a no-bus zone". AutoIndustriya.com. Retrieved June 21, 2020.
  8. ^ a b "Northbound section of Skyway Extension done by Dec". PortCalls. August 25, 2020.
  9. ^ "Vehicle Classifications". Toll Regulatory Board. Retrieved April 12, 2021.
  10. ^ a b "Inauguration of the SLEX Elevated Extension Project". RTVM. Alabang, Muntinlupa City. February 15, 2022. Retrieved February 15, 2022.
  11. ^ "SMC-SEC FORM 17-Q" (PDF). Security Exchange Commission. March 31, 2021.
  12. ^ a b "SMMSP | TRB". Toll Regulatory Board. Retrieved August 15, 2021.
  13. ^ "Skyway Susana Heights Northbound Extension on Track for December Completion". CarGuide.PH | Philippine Car News, Car Reviews, Car Prices. Retrieved April 17, 2021.
  14. ^ a b c Esmael, Lisbet K. (November 16, 2020). "SMC eyes road, rail projects to complement Bulacan airport". The Manila Times.
  15. ^ a b c Rey, Aika (December 28, 2020). "Skyway Stage 3 opens on December 29". Rappler. Retrieved January 8, 2021.
  16. ^ a b c "THIS IS HOW THE COMPLETED SKYWAY EXTENSION PROJECT WILL LOOK LIKE". San Miguel Corporation. October 14, 2019.[permanent dead link]
  17. ^ "Skyway Susana Heights Northbound Extension on Track for December Completion". CarGuide.PH | Philippine Car News, Car Reviews, Car Prices. Retrieved June 10, 2024.
  18. ^ "Implentation of B-O-T program too slow". Manila Standard. January 7, 1992. p. 15.
  19. ^ "A hospital for OCW's?". Manila Standard. November 13, 1992. p. 11.
  20. ^ "Highways-on-highways proposed". Manila Standard. December 30, 1992. p. 12.
  21. ^ Katahira & Engineers International (October 29, 1993). "Metro Manila Urban Expressway System Study" (PDF). Japan International Cooperation Agency. Retrieved April 6, 2023.
  22. ^ a b Speech of President Estrada at the opening of Stage I Phase I of the Metro Manila Skyway Project (Speech). Official Gazette of the Republic of the Philippines. December 10, 1998. Retrieved September 8, 2022.
  23. ^ Manila Bulletin News [@manilabulletin] (October 28, 2019). "Countdown to #MB120 Stage 1 of the elevated expressway in Metro Manila started in 1995 that would link NLEX, the Skyway, and SLEX with the approval of the STOA by former President Fidel Ramos in the following year" (Tweet). Retrieved April 9, 2024 – via Twitter.
  24. ^ "Manila Bulletin Main News". Manila Bulletin. Archived from the original on May 16, 1997. Retrieved January 22, 2022.
  25. ^ Chavez, Chito A. (March 17, 2004). "Construction of NAIA project starts today". Manila Bulletin. Manila Bulletin Publishing Corporation. Archived from the original on September 10, 2016. Retrieved July 14, 2016 – via HighBeam.
  26. ^ Sy, Marvin (May 31, 2009). "GMA inaugurates airport interchange". The Philippine Star. Retrieved July 14, 2016.
  27. ^ "Arroyo inaugurates NAIA expressway before leaving for Korea". GMA News. May 30, 2009.
  28. ^ "Construction of Skyway extension to begin". The Philippine Star. April 3, 2009. Retrieved March 13, 2021.
  29. ^ Deakin, James (December 22, 2010). "Skyway and SLEX extension to Sto. Tomas now open". The Philippine Star. Retrieved May 11, 2021.
  30. ^ "Skyway-Stage 2 Project opens to motorists". UNTV News and Rescue. April 7, 2011. Retrieved April 24, 2021.
  31. ^ Go, Marianne V. "China shows interest in completing Skyway project". Philstar.com. Retrieved September 14, 2024.
  32. ^ Chinese funds for Skyway sought. The Manila Times.
  33. ^ Amojelar, Darwin G. (September 27, 2013). "PNoy approves Citra's NLEX-SLEX Connector Road project". InterAksyon.com. Archived from the original on January 5, 2014. Retrieved July 16, 2021.
  34. ^ Tan, Kimberly Jane (January 22, 2014). "PNoy, PNCC, Citra Central, San Miguel launch P26-B PPP Skyway-3 project". GMA News.
  35. ^ "NAIA Expressway, Skyway 3, Line 2 to be delayed; traffic to worsen–MMDA". Philippine Daily Inquirer. September 14, 2015. Retrieved November 2, 2015.
  36. ^ "METRO MANILA SKYWAY STAGE 3 (MMSS-3) As of March 25, 2015". March 25, 2015. Archived from the original on May 9, 2015. Retrieved April 29, 2015.
  37. ^ "New Metro expressway eyed". Philippine Daily Inquirer. August 7, 2017.
  38. ^ "Metro Manila Skyway Stage 3 (MMSS3) Project". PPP Center.
  39. ^ Subingsubing, Krixia; Mercado, Neil Arwin (August 18, 2019). "Skyway coping beam falls, causing heavy traffic at NLEX". INQUIRER.net. Retrieved June 3, 2021.
  40. ^ Casas, Willie (February 2, 2020). "Pandacan fire to set back Skyway project". Manila Standard. Retrieved February 2, 2020.
  41. ^ "SMC: Skyway Stage 3 to open in November". CNN Philippines. July 16, 2020. Retrieved July 17, 2020.
  42. ^ Macaitan, Evelyn (July 21, 2018). "Skyway Stage 3 ramp opens in Makati City". The Philippine Star. Manila. Retrieved May 16, 2020.
  43. ^ Santos, Tina G. (July 22, 2019). "Buendia-Plaza Dilao part of Skyway opens". Philippine Daily Inquirer.
  44. ^ "ICYMI: Skyway Stage 3 to open by July, CALAX toll fees, BGC-Ortigas bridge update". TopGear.com.ph. February 9, 2020. Retrieved June 26, 2020.
  45. ^ Rey, Aika (October 13, 2020). "San Miguel completes Skyway Stage 3". Rappler. Retrieved October 15, 2020.
  46. ^ Amojelar, Darwin G. (October 13, 2020). "San Miguel completes 17.9-km Skyway Stage 3 project". Manila Standard. Retrieved October 15, 2020.
  47. ^ Cordero, Ted (October 13, 2020). "San Miguel completes Skyway Stage 3 project". GMA News Online. Retrieved October 15, 2020.
  48. ^ "Skyway Stage 3 to officially open on January 15". CNN Philippines. January 13, 2021. Archived from the original on January 13, 2021. Retrieved January 13, 2021.
  49. ^ "President Duterte inaugurates Skyway Stage 3 project". Presidential Communications Operations Office. January 14, 2021.
  50. ^ "Skyway Stage 3 opens to motorists". ABS-CBN News. January 15, 2021.
  51. ^ Rey, Aika (July 6, 2021). "San Miguel to charge toll at Skyway 3 starting July 12". Rappler. Manila. Retrieved July 6, 2021.
  52. ^ @SkywaySOMCO (April 1, 2021). "Motorist Advisory #SkywayStage3 #Skyway" (Tweet) – via Twitter.
  53. ^ @SkywaySOMCO (May 19, 2021). "#SkywayMotoristAdvisory #SkywayStage3 Scheduled temporary closure due to system testing by Toll Regulatory Board (TRB)" (Tweet) – via Twitter.
  54. ^ Camus, Miguel (January 28, 2021). "SMC says right-of-way issues delaying road linking Skyway 3 to NLEx". Retrieved March 29, 2021.
  55. ^ Grecia, Leandre (December 29, 2020). "Here are all the entry and exit points of the partially opened Skyway Stage 3". TopGear Philippines. Retrieved December 29, 2020.
  56. ^ Laurel, Drei. "Skyway Stage 3 partially opens tomorrow and will be free to motorists for 1 month". Top Gear Philippines. Retrieved December 28, 2020.
  57. ^ a b Remitio, Rex (July 8, 2021). "Skyway 3 toll rates released by regulatory board". CNN Philippines. Retrieved July 12, 2021.
  58. ^ Piad, Tyrone Jasper C. (December 2, 2022). "Metro Pacific offers to link NLEx Connector to SMC's Skyway". INQUIRER.net. Retrieved July 15, 2024.
  59. ^ "MPTC wants to build NLEX-Skyway 3 connector road". Manila Bulletin. Retrieved July 15, 2024.
  60. ^ Marcelo, Patrizia (November 2, 2017). "SMC eyes expansion of SLEx, Skyway, NAIAx". BusinessWorld.
  61. ^ "Skyway Extension commences". Tribune.net. August 6, 2019. Archived from the original on September 6, 2019. Retrieved September 6, 2019.
  62. ^ "San Miguel says to hasten construction of Skyway Extension southbound". ABS-CBN News. April 14, 2021. Retrieved April 15, 2021.
  63. ^ Hallare, Katrina (November 21, 2020). "1 dead, 4 injured as Skyway steel girder collapses, falls on vehicles in Muntinlupa". INQUIRER.net. Retrieved November 23, 2020.
  64. ^ a b Rey, Aika (April 12, 2021). "San Miguel opens Skyway Extension northbound section". Rappler. Retrieved April 12, 2021.
  65. ^ "Villar: Alabang Sucat Skyway Extension (Northbound) to open 2nd quarter of 2021". Philippine Information Agency. March 10, 2021. Retrieved March 11, 2021.
  66. ^ Marasigan, Lorenz (March 25, 2021). "'Northbound lane of Skyway extension to open soon'". Business Mirror. Retrieved March 25, 2021.
  67. ^ "Skyway Extension southbound off-ramp is now open". Philkotse. December 13, 2021. Retrieved December 13, 2021.
  68. ^ "PART I – BUSINESS AND GENERAL INFORMATION" (PDF). San Miguel Corporation. April 25, 2022. Retrieved April 5, 2023.
  69. ^ "San Miguel taps DMCI for Skyway extension project". Rappler. May 13, 2015. Retrieved April 1, 2022 – via Public-Private Partnership Center.
  70. ^ "PART I – BUSINESS AND GENERAL INFORMATION" (PDF). San Miguel Corporation. Archived from the original (PDF) on April 30, 2021. Retrieved April 30, 2021.
  71. ^ Dumlao, Doris C. (December 15, 2011). "San Miguel acquires 46% of Skyway operator". Philippine Daily Inquirer.
  72. ^ "Sucat-Alabang Skyway Connection and Ramp Extensions Project". Department of Public Works and Highways. Retrieved October 23, 2021.
  73. ^ "DOTr break ground on South East Metro Manila Expressway project". CNN Philippines. January 8, 2018. Archived from the original on February 14, 2019. Retrieved April 18, 2021.
  74. ^ "SOUTHEAST METRO MANILA EXPRESSWAY (C6) PROJECT". Department of Public Works and Highways. Retrieved February 24, 2021.
  75. ^ Laurel, Drei (November 16, 2020). "SMC to link Bulacan airport to NLEX, SLEX, MRT-7 via new road and rail network". TopGear Philippines. Retrieved February 25, 2021.
  76. ^ Altoveros, Jose (November 16, 2020). "SMC to link Bulacan airport to NLEX, SLEX, MRT-7 via new road and rail network". AutoIndustriya.com. Retrieved April 9, 2022.
  77. ^ a b Grecia, Leandre (June 23, 2022). "TRB approves expressway linking Skyway Stage 3 to Bulacan airport". Top Gear Philippines. Retrieved June 23, 2022.
  78. ^ "SOUTHERN ACCESS LINK EXPRESSWAY PROJECT". Toll Regulatory Board. Retrieved June 15, 2024.
  79. ^ "DOTr and SMC sign agreement for new Southern Access Link Expressway". Top Gear Philippines. Retrieved June 14, 2024.
  80. ^ Camus, Miguel; Sarao, Zacarian (April 26, 2021). "SMC eyes dedicated bus system on Skyway network". Philippine Daily Inquirer. Retrieved April 26, 2021.
  81. ^ "San Miguel eyeing bus rapid transit on Skyway: Ramon Ang". ABS-CBN News. April 26, 2021. Retrieved April 27, 2021.
  82. ^ a b Grecia, Leandre (December 1, 2022). "SMC's Seamless Southern Tollways project seeks to reduce stops for motorists". TopGear Philippines. Retrieved December 2, 2022.
  83. ^ a b "Skyway-SLEX-MCX". Toll Regulatory Board. Retrieved July 12, 2021.
  84. ^ a b c Pateña, Aerol John (January 31, 2018). "Skyway returns to old toll payment scheme". Philippine News Agency.
  85. ^ SLEX - MaTES [@OfficialSLEX] (November 30, 2022). "Tweet" (Tweet). Retrieved December 2, 2022 – via Twitter.
  86. ^ "SMC tollways to go 100% cashless by Jan. 11". Philippine News Agency. January 5, 2021.
  87. ^ "Everything you need to know about reloading your Autosweep RFID". Top Gear Philippines. October 9, 2020. Retrieved May 26, 2024.
  88. ^ Marasigan, Lorenz (July 7, 2021). "SMC: Only Class 1 vehicles with RFID may use Skyway 3". Business Mirror. Retrieved August 11, 2021.
  89. ^ "Skyway 3 won't allow trucks starting July 12". CNN Philippines. July 7, 2021. Archived from the original on July 11, 2021. Retrieved July 12, 2021.
  90. ^ "Metro Manila Skyway Stage 3". Toll Regulatory Board. Retrieved July 12, 2021.
  91. ^ "Road and Bridge Inventory". dpwh.gov.ph. Archived from the original on October 22, 2020. Retrieved June 14, 2020.
  92. ^ OpenStreetMap contributors (October 9, 2020). "Node: NLEx (7290149727)" (Map). OpenStreetMap. OpenStreetMap. Retrieved October 9, 2020.[self-published source]
  93. ^ a b c De Guzman, Marcus (September 29, 2021). "SMC to open three new Skyway 3 on-ramps this Friday". AutoIndustriya.com. Retrieved October 2, 2021.
  94. ^ OpenStreetMap contributors (February 11, 2021). "Node: Sgt. Rivera/C-3 (5555354439)" (Map). OpenStreetMap. OpenStreetMap. Retrieved February 11, 2021.[self-published source]
  95. ^ SKYWAY SOMCO [@SkywaySOMCO] (February 28, 2022). "#SkywayMotoristAdvisory #SkywayStage3" (Tweet). Retrieved March 1, 2022 – via Twitter.
  96. ^ "Sgt Rivera East bound on-ramp" open na! Official announcement from the toll operator., retrieved March 17, 2022
  97. ^ "Coming soon: two less Skyway bottlenecks". Philippine Daily Inquirer. December 28, 2022. Retrieved February 20, 2024.
  98. ^ SKYWAY SOMCO [@SkywaySOMCO] (April 5, 2023). "To our motorists, please be guided accordingly. Thank you" (Tweet). Retrieved April 5, 2023 – via Twitter.
  99. ^ a b Pateña, Aerol John (January 15, 2018). "Skyway to open new runway toll plaza".
  100. ^ a b "The other runway toll plaza is being removed to make way for the additional lane on skyway stage 1. While the alabang zapote / formerly south station toll plaza structure was completely removed. #tgif". Facebook. May 29, 2020.[unreliable source?]
  101. ^ SKYWAY SOMCO [@SkywaySOMCO] (April 20, 2021). "Effective April 19 at 6 AM, Hillsborough off-ramp will be closed to give way to construction works at the Skyway Extension project. #Skyway #SkywayExtensionProject #SMCTollways" (Tweet) – via Twitter.
  102. ^ Sarao, Zacarian (April 18, 2021). "Alabang viaduct steel ramp will be exclusive to southbound motorists starting April 19 — SMC". INQUIRER.net. Retrieved April 20, 2021.
  103. ^ SKYWAY SOMCO [@SkywaySOMCO] (April 20, 2021). "Effective April 19 at 6 AM, Steel Ramp northbound will be closed. #Skyway #SLEX #SkywayExtensionProject" (Tweet) – via Twitter.
  104. ^ "Temporary ramp at Alabang Viaduct going up Skyway now open". GMA News. December 1, 2019. Retrieved May 15, 2020.
  105. ^ "Ramp, reopened lane ease SLEx traffic". Philippine Daily Inquirer. December 2, 2019. Retrieved May 27, 2020.
  106. ^ "SMC's SLEX Elevated Extension to ease MM traffic, PRRD leads formal opening rites". sanmiguel.com.ph. February 16, 2022. Retrieved April 6, 2024.
  107. ^ OpenStreetMap contributors (January 8, 2021). "Node: Tomas Claudio (6326862259)" (Map). OpenStreetMap. OpenStreetMap. Retrieved January 8, 2021.[self-published source]
[edit]

14°30′23″N 121°2′7″E / 14.50639°N 121.03528°E / 14.50639; 121.03528