Portal:Transport/Selected article
This page is currently inactive and is retained for historical reference. Either the page is no longer relevant or consensus on its purpose has become unclear. To revive discussion, seek broader input via a forum such as the village pump. |
Note: Article entries are now being transcluded directly on the main portal page. However, this page should be retained for historical reference. |
Note: When adding a new Selected article, please be sure to update the "max" value in the "Random portal component" function as well.
The Mass Rapid Transit or MRT is a rapid transit system forming the major component of the railway system in Singapore, spanning the entire city-state. The initial section of the MRT, between Yio Chu Kang and Toa Payoh, opened in 1987, making it the second-oldest metro system in Southeast Asia, after Manila's LRT System. The network has since grown rapidly in accordance with Singapore's aim of developing a comprehensive rail network as the backbone of the public transport system in Singapore, with an average daily ridership of 2.406 million in 2011, approximately 71% of the bus network's 3.385 million in the same period.
The MRT network has 102 stations with 148.9 km (92.52 mi) of lines in operation, on standard gauge. The lines are built by the Land Transport Authority, a statutory board of the Government of Singapore, which allocates operating concessions to the profit-based corporations, SMRT Corporation and SBS Transit. These operators also run bus and taxi services, thus facilitating full integration of public transport services. The MRT is complemented by a small number of regional Light Rail Transit (LRT) systems in Bukit Panjang, Sengkang and Punggol that link MRT stations with HDB public housing estates. Services operate from about 5:30 am and usually end before 1 a.m. daily with intervals of approximately three to eight minutes, and services extended during festive periods such as Chinese New Year.
The London congestion charge is a fee charged on most motor vehicles operating within the Congestion Charge Zone (CCZ) in central London between 07:00 and 18:00 (Monday-Friday only). The charge, which was introduced on 17 February 2003, remains one of the largest congestion charge zones in the world despite the cancellation of the Western Extension which operated between February 2007 and January 2011. The charge aims to reduce congestion, and to raise investment funds for London's transport system.
The standard charge is £10 for each day, for each non-exempt vehicle that travels within the zone with a penalty of between £60 and £187 levied for non-payment. Enforcement is primarily based on automatic number plate recognition (ANPR). Transport for London (TfL) is responsible for the charge which has been operated by IBM since 1 November 2009.
Mass Transit Railway (MTR) is the rapid transit railway system in Hong Kong. Originally opened in 1979, the system now includes 211.6 km (131.5 mi) of rail with 155 stations, including 86 railway stations and 69 light rail stops. The MTR system is currently operated by MTR Corporation Limited (MTRCL).
Under the government's rail-led transport policy, the MTR system is a common mode of public transport in Hong Kong, offering efficiency and affordability, with over four million trips made in an average weekday. As of first-half 2009, the MTR has a 42% market share of the franchised public transport market, making it the most popular transport option in Hong Kong. The integration of the Octopus smart card fare-payment technology into the MTR system in September 1997 has further enhanced the ease of commuting on the MTR.
Construction of the MTR was prompted by a government-commissioned study released in 1967. The Hong Kong Government had previously commissioned a study in the 1960s to find solutions to the growing traffic problem caused by the expansion of the territory's economy. Construction started soon after the release of the study, and the first line was opened in 1979. The MTR was immediately popular with residents of Hong Kong; as a result, subsequent lines have been built to cover more territory. There are continual debates regarding how and where to expand the MTR network.